Vessel Name : KM Kota Belud
Work Routine : Perform corrective maintenance to rectify the fuel injector leaking
In summary, the maintenance work involves a thorough inspection and replacement process for the main engines. It begins with external checks and monitoring the MCS system, followed by inspecting the fuel system for leaks. Filter and fuel injector replacement, along with meticulous reassembly is undertaken. After filling and bleeding the fuel system, a pre-start check is performed, both main engines are started, and their parameters are monitored during a gradual speed increase.








